================================================================================ ZT-AGENCY CHINA -- CONTAINER STUFFING & PRE-CARRIAGE INSPECTION CHECKLIST Used for FCL Quality Control, Lashing Verification & Marine Insurance Records ================================================================================ Date of Stuffing: YYYY-MM-DD Warehouse/Factory Location: Inspector / Supervisor Name: Contact: 1. CONTAINER INTEGRITY CHECK (7-POINT PHYSICAL INSPECTION): Container No: ____________________ Size/Type: [20GP / 40GP / 40HQ / Reefer / FR] Tare Weight: ______ KG Max Gross Payload: ______ KG [ ] Exterior Walls: Free of major dents, structural holes, or corrosion punctures [ ] Interior Floor: Clean, dry, odor-free, no oil stains, no protruding nails [ ] Roof & Corners: Watertight (verified inside with doors closed, zero daylight) [ ] Door Hinges & Locking Bars: Smooth operation, no bent cam keepers [ ] Rubber Gaskets: Intact, continuous, no tears or dry rot 2. CARGO STUFFING & WEIGHT DISTRIBUTION: Total Packages Verified: _______ units against Packing List Weight Distribution: [ ] Evenly distributed along container floor length [ ] Heavy items placed on bottom, lighter items on top [ ] Center of gravity aligned within standard 60/40 longitudinal tolerance 3. SECURING, CHOCKING & LASHING: [ ] Timber Floor Chocking: Heavy wood blocks nailed to timber floor [ ] Dunnage Airbags: Inflatable airbags installed in void spaces > 15 cm [ ] Lashing Straps: Heavy-duty polyester composite straps tensioned to corner rings [ ] Desiccant Bags: High-absorption calcium chloride desiccant hung inside 4. HIGH-SECURITY BOLT SEAL APPLICATION: Bolt Seal No: ________________________ (ISO 17712 'H' Certified) Applied To: Right-hand door locking cam keeper hole Photograph Taken: [ ] Empty Container [ ] Half-Loaded [ ] Fully-Loaded [ ] Sealed Door Supervisor Signature: _______________________ Date: _______________________ ================================================================================